---
name: progress-map
description: Show a fixed-format, color-coded text progress board for work that is split into phases or steps - what is done, what is in progress, what is left, and what comes next. Use whenever the user wants a high-level view of where a multi-phase project or plan stands, e.g. "what's left", "how far along are we", "where are we in the plan", "show me the phases", "show progress", "status overview", "what have we done so far", "roadmap view", or /progress-map, even if they never say "visualize" and even when no plan was ever written down. Always renders the exact same layout from a bundled script, so the user can read it at a glance every time.
---
# Progress map
The user builds projects with Claude Code in phases and steps. Partway through, they want to
glance at one picture and know: what is done, where we are, what is left.
The whole value of this skill is that the picture is **identical in form every time**. A
board that changes shape between sessions has to be re-read from scratch; one that never
changes can be absorbed in two seconds. So the layout is not yours to design. A script
draws it. Your job is to get the facts right and hand them to the script.
It is a text board on purpose: Markdown headings and a few small code blocks. Do not turn
it into HTML, an artifact, a widget, a table or an image, even where those are available.
Less is more here. The board says each thing once: the totals in the count lines, a
blocked step and its reason on that step's row, the next thing to pick up in the footer.
Resist adding to it, in the JSON or in the text around it. Terms are defined in
`GLOSSARY.md` next to this file; use them as defined.
## 1. Find the plan
Look for the real source of the phases, in this order, and stop at the first that fits:
1. Whatever the user points at ("the migration plan", a file, a ticket).
2. A plan already in this conversation: an accepted plan, the current task list, phases
you or the user laid out earlier.
3. Plan files in the project: `PLAN.md`, `ROADMAP.md`, `TODO.md`, `docs/` or `plans/` or
`specs/` folders, `.claude/plans/`, phase or checklist sections in the README.
4. A tracker, when the plan is laid out there (project milestones, an epic's sub-issues).
5. Nothing written down: see "When there is no written plan" below.
Keep the plan's own phases, in the plan's order, under the plan's names. Do not invent
phases, merge them, or rename them to sound better: the user thinks in the plan's words
and will look for them. The only trimming is mechanical: drop a leading "Phase 3:" or
"Step 2 -" (the board numbers the rows itself), and drop file paths, links and status
remarks from a name ("Article repository (`src/store/articles.py`) — started" becomes
<!-- ‹guest · 2026-11-29› -->
the step "Article repository" with status `active`). Short references the user works by,
such as a PR or ticket number, can stay.
### When there is no written plan
Much real work has no plan file: a ticket, a few sessions, some PRs. The board still has
to look the same next week as it does today, and phases re-invented from memory each time
will not. So the first board becomes the plan of record.
1. Look in `~/.claude/progress-map/` for a saved map of this work. Files are named after
the ticket key or project: `proj-123.json`, `invoice-sync.json`. If one is there, it
is the plan. Keep its phases and steps, their names and their order; update statuses.
Add a step only for work that has really appeared since, mark dropped work `skipped`
instead of deleting it, and say under the board what you added. Set the subtitle to
`source: saved map`.
2. If there is none, build the phases from what exists: this conversation, the ticket and
its comments, PRs and the git history. Set the subtitle to `source: inferred`.
- Phases are outcomes the work has to reach ("Prod deploy", "Service published"), not
a diary of sessions. Three to seven is typical.
- Steps are concrete things that are either true or not ("Manifests merged", "Health
check green"), including the ones still ahead and the ones waiting on other people.
- Leave out anything you would be guessing at. A shorter honest map beats a padded one.
3. Save the JSON to `~/.claude/progress-map/<slug>.json` (create the folder if needed)
and render from that file. Save again whenever statuses change. Tell the user in one
line under the board that there was no written plan and where the map was saved, so
they know the phases are your reading and can correct them once.
If the user would rather keep the map in the repo or the ticket, put it where they say.
## 2. Work out what is actually done
A checkbox says what someone intended to record, not what is true. Before marking things
done, take a quick look at reality where it is cheap: does the file or feature exist, is
there a commit for it, do the tests for it pass if they are fast to run. Open the file
rather than just listing it: a stub, a `TODO` body or a `NotImplementedError` is a step
that has been started, not finished. This is a glance, not an audit. A minute or two is
about right; do not run long builds for it.
Statuses:
<!-- ‹guest · 2026-11-29› -->
| status | meaning | color |
|-----------|----------------------------------------------------------------|--------|
| `done` | finished and working, nothing left to do on it | green |
| `active` | started but not finished, or being worked on right now | orange |
| `todo` | to do: not started | red |
| `blocked` | cannot proceed until something outside the step changes | red |
| `skipped` | deliberately dropped; not counted in the totals | none |
Half-done is `active`, never `done`. If the plan says done and the code disagrees, go
with the code and say so under the board (not in a `note`). If you cannot tell, use
`active` or `todo` and say which items you were unsure about. An honest board with a
caveat is worth more than a tidy one that is wrong.
## 3. Write the plan as JSON
```json
{
"title": "Invoice sync",
"subtitle": "source: PLAN.md",
"phases": [
{
"name": "API layer",
"steps": [
{"name": "Auth endpoints", "status": "done"},
{"name": "Rate limiting", "status": "active"},
{"name": "Billing hooks", "status": "blocked", "note": "waiting on sandbox keys"},
"Webhooks"
]
},
{"name": "Deploy", "status": "todo"}
]
}
```
- `title`: the short project name ("Feedreader", not "Feedreader — build plan").
`subtitle`: where the plan came from (`source: PLAN.md`, `source: this session`,
`source: saved map`, `source: inferred`).
- A phase with `steps` gets its status and count from the steps; do not set it by hand.
A phase without steps needs its own `status`.
- A step given as a bare string is `todo`.
<!-- ‹guest · 2026-11-29› -->
- `note` is for the few words that say why an item is `blocked`. Leave it off everything
else; notes on every row destroy the glance. Keep it under about 30 characters: a step
and its note share one line, and a long pair gets its name cut short.
- Names: aim for under 30 characters for phases and under 40 for steps; the script clips
anything longer.
- The `NEXT` line picks the first `active` step, or else the first `todo` one. When
several steps are `active` and that would point at the wrong one, put `"next": true`
on the step the work should actually continue with.
- A flat plan with no phases (just a list of steps): make each step a phase without
steps. Do not invent groupings.
- Granularity: steps are the plan's steps, not individual file edits. If a phase has more
than about ten, you have gone too fine; use the plan's own sub-headings.
## 4. Render it
Run the bundled script from wherever you are, with the JSON on stdin or as a file path.
```bash
python3 "${CLAUDE_SKILL_DIR}/scripts/render.py" <<'JSON'
{ ...the plan... }
JSON
```
The script is `scripts/render.py` next to this file. If the path above did not come
through as a real directory, use the skill's base directory shown when it loaded.
By default the board lists every phase on one line with its step count, then opens only
the phases that are in progress or hold a blocked step (if there is none, the next one to
start). An open phase lists what is still ahead in it; its finished steps are folded into
the "2 of 5 done" beside its name. Skipped phases and steps are left off. That is the
high-level view the user asked for.
- `--all`: open every phase and list every step, finished and skipped included. Use when
the user asks for the full or detailed breakdown.
- `--compact`: phases only. Use when the user asks for just the phases.
## 5. Show it
The script prints Markdown, ready to be the body of your reply: a heading for the
project, section headings, bold labels, and small fenced `diff` blocks holding the status
<!-- ‹guest · 2026-11-29› -->
rows. Paste it exactly as printed.
- Do not wrap it in a code fence of your own. The headings and bold are what separate the
sections; inside a fence they would show as raw `##` and `**`.
- Leave the `diff` blocks alone. A chat reply cannot carry terminal colors, so each row
starts with a marker (`+` done, `!` in progress, `-` to do or blocked) and the
highlighter paints those rows green, orange and red. Re-indenting a row, dropping its
first column or changing the block's tag loses the color.
- Do not change heading levels, reorder sections, merge blocks, add emoji, or add rows.
If the user says the colors do not show up or the markers bother them, rerun with
`--style plain` and put that output in one block tagged `text`. In a real terminal the
script prints true colors and bold by itself (`--style ansi` forces it).
After the board, add at most three short lines, and only for things the board cannot
show: where the plan and the code disagree, a status you were unsure of, or that there
was no written plan and where the map was saved. Do not restate the board in prose; the
user has just read it. If there is nothing to add, add nothing.
The board shows counts, not a percentage, and that is deliberate: steps are not equal in
size, so "45% done" would claim a precision about effort that a step count cannot back
up. Do not add a percentage in the prose either.
## What it looks like
This is the script's output for a five-phase plan, shown raw:
````markdown
## Invoice sync
source: PLAN.md
```diff
█████████████████▓▓▓░░░░░░░░░░░░░░░░░░░░
+ ✓ 7 done
! ► 1 in progress
- ○ 7 to do
- ✗ 1 blocked
```
### Phases
<!-- ‹guest · 2026-11-29› -->
```diff
+ ✓ 1 Foundation 3/3
+ ✓ 2 Data model 2/2
! ► 3 API layer 2/5
- ○ 4 Frontend 0/4
- ○ 5 Deploy 0/2
```
### Open phases
**3 · API layer** · 2 of 5 done
```diff
! ► Rate limiting
- ○ Webhooks
- ✗ Billing hooks — waiting on sandbox keys
```
**Next:** Rate limiting · phase 3, API layer
````
Reading it:
- The first block is the totals. Its four count lines are also the legend: `✓` done,
`►` in progress, `○` to do, `✗` blocked. The bar is all steps: `█` done, `▓` in
progress, `░` the rest. The blocked line appears only when something is blocked.
- **Phases** has one row per phase: number, name, steps done out of steps in it.
- **Open phases** has one bold label and one block per open phase.
- **Next** is the first in-progress step, or else the first to-do one. When everything
is done it reads **Done** instead.
## If the script cannot run
If `python3` is missing or the script errors in a way you cannot fix by correcting the
JSON, reproduce the layout above by hand: same headings, same order, same first-column
markers and symbols, same **Next** line. Say in one line that it was
hand-drawn, so a small misalignment is not a surprise.
این نسخه با نشانهگذاری اختصاصی حساب شما نمایش داده میشود. برای نصب سریع، به تب نصب و راهاندازی بروید.