---
name: tracker
description: Plans and records work in the issue tracker the way this organization does it, with a milestone, epics, issues, and an intent for each work item that holds its goal, its scope, and its acceptance checks. Use when the user wants to plan an iteration, create or update a milestone, an epic, or an issue, or close an epic. Do not use for a code review, for an explanation of code or scripts, or for a change to the code itself.
---
# Tracker
Read `charter.toml` first. `tools.issue_tracker` names the tracker; for `github-issues` use `gh`. The
organization source of the contract holds the text rules for issues: no private material, no names of
other projects, no session links. Plan from `docs/product.md`, not from memory. Before you create: search
the tracker for an item on the same subject and update it; no duplicates. Make a decision in the
conversation and record it in the epic or the work item it belongs to. Never open an issue for a decision.
## Structure
- A milestone is a goal, with its acceptance check in the description.
- An epic is what we want to do. Label `epic`. Body: "What we want", the issues as a task list, "Decisions made".
The milestone "Roadmap" holds the epics of parts that are decided but not scheduled; their issues come when the part comes near.
- An issue is one actionable item. Body: goal, in scope, out of scope, and one line that names its
intent: `Intent: intents/<part>.md`. Each change to a source file has an issue, also a small one.
## The intent of a work item
`intents/<part>.md`: goal, in scope, out of scope, acceptance checks. An automatic check names its test
or its command. A manual check names who does it and why it is not automatic; automatic is the default.
A manual check whose result the agent drafts, a reading of evidence, carries the clause `drafted by the
agent, reviewed by an agent that is not the author, confirmed by <the role>`; the skill `evidence-review`
runs that review. A person approves the intent through a change request; that merge is the approval, and
the work starts after it. Each test cites the intent and the number of its check. Before the code: the agent writes the plan
`plans/<part>.md` (the steps, the files, the tests), then stops and asks the person who holds the work item to accept it,
in the conversation; the code starts after the acceptance. A work item for a run (the label `charter-run`): one change
request that one run can finish, automatic checks only, no network and no secret during the work. A change of a file that
the boundary closes is its own work item, for a person.
## Changes and closing
A change request names its issue: `Closes #N`; the change request of the Plan phase, the intent alone, says `Part of #N`,
which links without closing. When a file under a code path changes and no necessary document, the change request carries
one line: `No document change: <reason>`. A false failure of a gate: `False failure: <gate>: <reason>`. An epic closes when its last issue closes, with a comment on what it delivered.
— ‹guest · 2026-11-25› —
این نسخه با نشانهگذاری اختصاصی حساب شما نمایش داده میشود. برای نصب سریع، به تب نصب و راهاندازی بروید.